images-4There are three main methods of installation. Which method is used depends on each individual job. We can also carry out all the preparatory work required prior to fitting which may include floor levelling, damp proofing, plywood or joist reinforcement.

The 3 main methods of installation are:

  • Glue Down (a full bed of adhesive)
  • Nail down (concealed or “secret” nailing)
  • Floating (using and underlay and gluing the floor joints)

Our surveyors will be able to advise you of the best way to fit the floor and our fitters are experts. We can also carry out all the preparatory work required prior to fitting which may include floor levelling, damp proofing, plywood or joist re-enforcement.

Floor Fitters London

When you book your installation with EURO FLOORS, the fitters will arrive on the day with a comprehensive schedule of works. They will run through the details with you and explain what, where and how they are going to install your floor. You are encouraged to ask as many questions as you feel the need to.Unknown

The installation team leader will be able to explain the whole process to you and will also be able be able to give you an estimated completion time.

Upon completion you will be invited to inspect the work. Provided you are happy, you will be given a Customer Satisfaction Form where we invite your comments.

We are happy to provide you with Care and Maintenance details for the floor if we have supplied or finished it and we put no time limit on the help and advice we are prepared to offer.

Contact us


Trusted by